Office & Workspace 
We cover a wide range of commercial office work over a large geographical area 
Our qualified and experienced team of plumbing and heating engineers can deliver your commercial office scheme or workplace scheme to the highest standard. Please give us a call to chat through your project requirements and we can provide a quote from your plans. 
 
We have experience of working directly for end users and project management companies on both new build and refurbishment projects. Take a look at some of the commercial office projects we have undertaken for our clients over the past 18 months: 

Grant Thornton, Manchester 

MBM Services were instructed to provide the plumbing element of a project in Grant Thornton's new office in a 13k sq ft space within the BREAM Excellent Landmark Building in St Peters Square. We commenced the project in June 2021 and completed the plumbing elements of this fit out and completed this top quality project at the end of September. Work included the following: 
 
First and second fix of the main entrance coffee bar including insulated cold water supply and an isolation and drain point for chlorination. 
First and second fix of the kitchen area and drinks point including: insulated cold water supply to sinks, hot water tap and dishwashers; fitting of waste and connection to the soil system; second fix of water heaters and dishwasher; and installation of an isolation and drain point for chlorination. 
First and second fix of cleaners store including: insulated cold water supply; fixing of an isolation and drain point for chlorination; installation of waste and connection to the soil system; and second fix of water heater. 
First and second fix of the wellbeing room including insulated cold water supply; fixing of an isolation and drain point for chlorination; fixing of waste and connection for a drain master; and second fix of water heater and WUDU. 

AJ Bell Plc, Salford Quays 

In November 2020 MBM were commissioned by AJ Bell plc to project manage the refurbishment of the gym changing facilities and shower areas at their head office in Salford Quays. The project included managing all trades to complete the transformation of the changing facilities and showers, completed on time and to budget. Work undertaken included: 
 
Installation of hot and cold water supplies (inc. chlorination). 
Installation of trays and enclosures. 
Installation of saniclad wall cladding. 
Second fix of shower areas and toilets. 
Installation of non slip flooring. 
 

Liver Buildings, Liverpool 

In February 2020 MBM was commissioned to provide the plumbing works required as part of the refurbishment of two office floors within the Grade I listed Liver building. Our work included the following elements: 
 
Installation of new drainage pipework (inc. chlorination) and grease traps. 
Installation of hot and cold water supplies to research kitchens and tasting areas. 
Pressure testing of pipework and certification. 

The Plaza, Liverpool 

In March 2020, MBM was commissioned to complete the plumbing work associated with the refurbishment of the Plaza offices in Liverpool. Our engineers installed the plumbing and drainage infrastructure for 4 kitchens and 1 first aid room, including the following work: 
 
Installation of boosted cold water supplies. 
Insulation of pipework. 
Installation of abs waste. 
Installation of macerators for tea point, first aid and kitchen areas. 
Installation of water heaters. 
Second fix of plumbing and drainage. 

Concentrix (Global Business Services), Stockport 

In February 2020, MBM undertook the refurbishment of four blocks of toilets in a call centre in Stockport. The project included the following: 
 
Isolation and strip out of existing services and sanitaryware. 
Installation of boosted hot and cold water supplies. 
Installation of thermostatic mixing valves. 
Installation of sanitary ware and sensor taps. 
Commissioning of toilet areas. 

One The Embankment, Leeds 

In November 2020, MBM were instructed to strip out existing facilities and install new tea points and cleaners areas, as part of an office refurbishment project for new tenants. Works included: 
 
Isolation and strip out of existing low temperature hot and cold water supplies. 
Installation of boosted cold water supplies from existing plant room areas. 
Installation of metered water supplies. 
Insulation of pipework throughout the main office area. 
Installation of macerators and pumped waste pipework. 
Second fix of teapoints. 
Second fix cleaners areas. 
Chlorination of pipework 

BP Portacabins, Manchester Airport 

In February 2020, we were commissioned to install the water supply and drainage for new portacabins installed for BP workers at Manchester Airport. 